Date Task Description Time Spent Was this a Best Practice? 
3/27Started background for shop menu, burn down chart, made rough draft for shop menu50min /
3/28 Added words and detail to shop menu40min /
3/29 Finished shop background menu and details 45min /
3/30 Made the level background 2D and added gross details and made the background more detailed 40min /
3/31 Finished pre production, updated tracking sheet, started designing level up screen. 45 min /